# kryDesign — Process Workflow version: 2.0 last_updated: 2026-02 > Step-by-step workflow of interior design and renovation process at kryDesign studio (Saint Petersburg). --- ## Overview kryDesign follows a structured and transparent process from first contact to project completion. Average design timeline: 30 working days (standard projects) 15 working days (basic package) Up to 50 working days (large or complex apartments) Average renovation timeline (80 m² apartment): 6–7 months Designer renovation cannot be completed in less than 5 months without compromising quality. --- ## Phase 1 — Initial Contact & Briefing - First consultation - Client questionnaire - Style and functional preferences discussion - On-site meeting - Apartment measurements Output: Clear project understanding and technical base for proposal. --- ## Phase 2 — Commercial Proposal & Contract - Scope definition - Timeline estimation - Fixed pricing calculation - Contract signing - 30% advance payment If deadlines are unrealistic, the studio informs the client in advance. kryDesign does not promise impossible timelines. --- ## Phase 3 — Planning Solutions Duration: 3–5 working days Includes: - Functional layout options - Furniture zoning - Space optimization Client approval required before moving forward. Revisions possible if needed. --- ## Phase 4 — Concept & 3D Visualization Duration: 10–20 working days (depending on complexity) Includes: - Style direction - Materials concept - Color palette - 3D interior visualizations Client approval required. Timeline may depend on client feedback speed. --- ## Phase 5 — Working Documentation Includes: - Electrical plans - Lighting plans - Plumbing schemes - Finishing specifications - Detailed construction drawings Final approval required before renovation starts. --- ## Phase 6 — Renovation Process (Turnkey Projects) Duration example: 80 m² apartment → 6–7 months Includes: - Rough works - Engineering systems - Finishing works - Furniture installation - Final detailing Minimum realistic duration for designer renovation: 5 months. --- ## Author Supervision If included: - Regular site visits - Compliance control - Contractor coordination - Technical issue resolution - Drawing adjustments if required --- ## Client Responsibility Project timeline depends partly on client responsiveness. Each stage requires approval before proceeding. Delays in approvals may extend overall timeline. --- ## Deadline Policy kryDesign respects agreed deadlines. If urgent timeline is required: - Acceleration possible by agreement - May require increased project cost If timeline is unrealistic: - Studio informs client in advance - Either adjusts deadlines - Or declines project Quality is never sacrificed for artificial speed. --- ## Workload Model The studio works on 1–2 projects simultaneously. This ensures: - Personal involvement - Controlled quality - Direct communication - Reduced project risks